Construction Begins from Original Barn Beams |
Construction: Welding |
Fred Inspects Welding |
Fred and First Beam Layout |
Initail Figure Models for Scaling |
Powder Coating Step One: Chemical Treatment |
Powder Coating Step Two: Zinc Undercoating |
Powder Coating Step Three: Polyester Topcoat |
The Site: Harmony, Florida |
Concrete Pads Poured |
Installation Day: Crane Rental |
The First Beam is Placed |
Beam Placement and Assembly |
Beam Placement and Assembly |
The Boy is Placed |
Father Figure is Loaded Onto Crane |
Father is Lifted Into Place |
Fred and Harmony Developer, Jim Lentz |
Mother Figure is Loaded Onto Crane |
Mother Figure is Fitted Into Place |
Final Sculpture |
Installation Crew Poses: A Job Well Done |