![]() Construction Begins from Original Barn Beams |
![]() Construction: Welding |
Fred Inspects Welding |
![]() Fred and First Beam Layout |
Initail Figure Models for Scaling |
![]() Powder Coating Step One: Chemical Treatment |
![]() Powder Coating Step Two: Zinc Undercoating |
Powder Coating Step Three: Polyester Topcoat |
The Site: Harmony, Florida |
![]() Concrete Pads Poured |
Installation Day: Crane Rental |
![]() The First Beam is Placed |
Beam Placement and Assembly |
![]() Beam Placement and Assembly |
The Boy is Placed |
![]() Father Figure is Loaded Onto Crane |
![]() Father is Lifted Into Place |
![]() Fred and Harmony Developer, Jim Lentz |
![]() Mother Figure is Loaded Onto Crane |
![]() Mother Figure is Fitted Into Place |
![]() Final Sculpture |
![]() Installation Crew Poses: A Job Well Done |